TSF Cell 1 Lift 2

Works include:
– Pit development and drill/blast
– Pit preparation and in-pit haul roads
– Load and haul
– Haul road maintenance

Raising the embankment level on the existing Tailings Storage Facility (TSF) through recovery of tailings materials and waste material from the mining process.
projects_img
Value

4.6M

Client

Macmahon Contractors

Duration

2020

Completion Date

2020